SIA "DEVOR" offers an optimal solution for the construction of large span structures.
These structures consist of unified tubular profile assemblies and assemblies, the use of which allows for a minimum metal capacity and labor intensity, while offering a large selection of constructive forms.
Construction technology allows building buildings with a span of up to 120 m in short time, without intermediate stones.
The use of spatial cross stitch structures for use in construction of large-span structures of commercial importance:
1. Saving money
This advantage is achieved at the expense of reduced metal capacity compared to traditional technologies and materials, as well as lighter columns and foundations.
2. Short construction deadlines
1000 m2 Construction of the structure will require an average of 5-7 business days (the production of standard metal constructions will take 20 days), assembly - 5 working days (standard metal constructions assembly - 15 days).
3. Mobile delivery
In one standard truck it is possible to transport up to 1000 m2 big constructions.
4. Great choice of technical solutions
Various architectural forms, universal deployment of engineering networks, the possibility of strengthening various types of equipment.